Route, cargo and risk

LWC Low water surcharge

Raised on river barge legs when falling water levels make each trip more expensive.

How the charge works

Where it is billed
A local charge at the port of loading, the port of discharge or both, with its own code at each end.
How it is counted
Charged per box moved by barge, in steps that follow official water level readings.
What changes the amount
Gauge readings on rivers such as the Rhine: when water drops, barges sail part loaded and more trips are needed for the same cargo.
Also seen on quotes as
LWS

Abbreviations follow the Maersk charge list; another carrier may print the same charge under a different code. Amounts depend on the trade and the date, so always confirm them in the carrier tariff.

Keep the extra charges down

Watch free time run out, compare sailings and transit times, and fill every container before you pay for it.